GCNZ during construction.
Roofing membrane being delivered to site.
HIAB unloading material to site.
Day 1 on site, getting substrate ready for the roof membrane.
Substrate is clean and ready to receive the Nuraflux primer.
Technicians installing the Nuraply base sheet to the main roof.
Moabi and Mussi installing the cap sheet roofing membrane.
Mechanical Room Roof looking good after install.
Drone view of the building after completion.
Nuralite Nuraply 3P/3PM Roof System